Posted Date: 2012-01-26
Soil & Sub-Soil Investigation along pipeline route, on different stations, on river bottoms, depth measurement of rivers and soil resistivity test along pipeline route and different stations for CP system.
Download the attachment |
|
Posted Date: 2012-01-12
Construction of Boundary Wall, Guide Wall, Brick Block Slope Protection Work, Approach Road, Security Post and Land Development Works at CGS Khulna under Bheramara-Khulna Gas Transmission Pipeline Project (Re-Tender).
Download the attachment |
|
Posted Date: 2011-12-15
Invitation for Bids-Design, Build and Turnkey Supply, Installation, Construction, Testing, Commissioning of Metering and Manifold Station Located at Dhanua, Gazipur.
Download the attachment |
|
Posted Date: 2011-12-13
Re-Tender for Construction of 2-storied (5-storied foundation) Manager & Deputy Managers’ Quarter at Ishwardi TBS under Jamuna-Bheramara Gas Transmission Pipeline Project (Re-Tender).
Download the attachment |
|
Posted Date: 2011-09-20
Route Survey for Construction of Gas Transmission Pipeline from Dharmapasha, Sunamganj to Kishoreganj.
Download the attachment |
|
Posted Date: 2011-08-23
IFT for Procurement and Supply of Coating and Wrapping Materials; For (b)GTCL/J-B-D/MP-06/Plug Valve: Procurement and Supply of Plug Valve and For (c) GTCL/J-B-D/MP-09/TEG: Procurement and Supply of Thermo Electric Generator (TEG)
Download the attachment |
|
Posted Date: 2011-08-10
IFT for Shifting of 1.4 Km x 24” OD BKB-Chittagong & 2.2 Km x 20” OD BKB-Demra Gas Transmission Pipeline due to Dhaka-Chittagong 4-Lane Highway Construction in 03 (Three) Lots.
Download the attachment |
|
Posted Date: 2011-05-03
Construction of Herring Bone Bond pipe yard at Hatikumrul, Sirajganj (Re-Tender).
Download the attachment |
|
Posted Date: 2011-04-27
Installation of Submersible Deep Tubewell and other Ancillary Works under Compressor Station Project at Ashuganj, B-Baria
Download the attachment |
|
Posted Date: 2011-04-07
Construction of Pre-Engineered Steel Ware House and Internal Road at Ashuganj Gas Manifold Station, B-Baria.
Download the attachment |
|