Posted Date: 2010-06-15
Extention of bid submission deadline for river crossing of Bheramara-Khulna Project
Installation of 20' OD high pressure natural gas pipeline by Horizontal Directional Drilling (HDD) method across the Kumar, the Naboganga-1, the Naboganga-2, the Begabati, the Chitra and the Buri Bhairab rivers on design, procurement, supply, installation, testing and commissioning on turnkey basis.
Download the attachment |