Invitation For Bids For engagement of Turnkey Contractor For Design, Supply and Installation of Bakhrabad-Siddirganj Gas Transmission Pipeline, RMSs and Associated Facilities
Invitation for Bids for the construction and completion of the followings Facilities on TURNKEY and on a single responsibility basis:
(a) A 30˝ dia gas transmission pipe line with approximate length of 60 km which includes river crossings, other crossings etc. from Bakhrabad Gas Field under Muradnagar thana of Comilla district to Siddhirganj Power Station under Siddhirganj thana of Narayanganj district along with associated above ground and underground installations, valve stations, scraper trap stations, etc including khal, pond, ditch and road crossings along the route;
(b) Six (6) river crossings by HDD method (the Gomuti-1900 meter, the Kajla-850 meter, the Meghna-1650 meter, Asariar Char-750 meter, the Old Brahmaputra-550 meter and the Sitalakhya-550 meter; all are bank to bank distances);
(c) One (1) Metering Station at Bakhrabad;
(d) One (1) Regulating & Metering Station (RMS) at Haripur;
(e) One (1) Regulating & Metering Station (RMS) at Siddhirganj;
(f) Cathodic Protection System of the pipeline and facilities;
(g) SCADA/Tele-communication facilities;
(h) Laying of Optical fiber cable; and
(i) Hook up with existing SCADA networks at Meghnaghat, Haripur, Siddhirganj and hook up with existing SCADA and proposed SCADA network at Siddhirganj to existing Master Control Center at Demra.