PROJECT
Project Name   SCADA Telecomunication System
Project Type   Completed
Objective   The main objective of the project was collect continuous operational data including safty warnings from the gas transmission system and transmit it to a central control centre for interpretation and interaction, if needed, for neccessary safe operation and dispatch of gas to different gas withdrawal location. SCADA, the Supervisory control and data acquisition, allows accute monitoring of all transmission parameters such as gas flow at supply and off-take points, line pressure through the netwark, movement of gas and condensate volumes and quality of gas being supplied to the system. Futhermore, the SCADA will provide pipeline integrity monitoring, leak detection and alarm, metering values of gas and condensate at each of the inlet and outlet points, open-closed status of all line and station valves, direct digital data transmission and voice communication.
Salient Feature   Digital Microwave Telecommunication System: a) 18 nos. microwave sites (9 nos. new and 9 nos. existing towers with neccessary modification/refurbishment/replacement). b) PABX/Telecom/Telephone/DTMF for 18 nos. microwave sites. c) DC Generators and UPS with necessary cables for 18 nos. Microwave base stations. d) 50 nos Mobile Radio Communication Sets. e) Operational Spare Parts. f) Required Instrumentation for 18 nos VHF Base Stations. g) Required Tower foundation and other ancillary civil construction works for 18 nos VHF Base Stations.



Others   Starting date July 1995, completion date November 2003. Approved Total cost Tk 189.71 crore(foreign:161.75, Local: 27.96 ). Actual cost Tk 189.71 crore(foreign:161.75, Local: 27.96)
Contact Information  GM Planning
Download File