To Evacuate gas and condensate from Beanibazar gas field to national grid.
Salient Feature
a) Jamuna Bridge : Length 09 km, dia 30 inch. Linepipe specification API 5L 60X LSAW. Thickness ----, Coating Hot applied Coal Tar Enamel and CC. Valve station 2 nos and scraper station 2 nos. Capacity 300 mmcfd(MAOP 1000 psig)
b) Elenga-Nalka : Length 28.50 km, dia 24 inch. Linepipe specification API 5L 60X LSAW. Thickness ----, Coating Hot applied Coal Tar Enamel and CC. Valve station 2 nos and scraper station 2 nos. Capacity 250 mmcfd(MAOP 1000 psig)
c) Nalka-Baghabari : Length 35.50 km, dia 20 inch. Linepipe specification API 5L 60X LSAW. Thickness ----, Coating Hot applied Coal Tar Enamel and CC. Valve station 2 nos and scraper station 2 nos. Capacity 250 mmcfd(MAOP 1000 psig)
Others
Starting date July 1997, completion date June 2000. Approved Total cost Tk 304.00 crore(foreign:93.79, Local:210.21). Actual cost Tk 172.39 crore(foreign:0.24, Local:172.15)