PROJECT
Project Name   Pashchimanchal Gas Transmission Project
Project Type   Completed
Objective   To Evacuate gas and condensate from Beanibazar gas field to national grid.
Salient Feature   a) Jamuna Bridge : Length 09 km, dia 30 inch. Linepipe specification API 5L 60X LSAW. Thickness ----, Coating Hot applied Coal Tar Enamel and CC. Valve station 2 nos and scraper station 2 nos. Capacity 300 mmcfd(MAOP 1000 psig) b) Elenga-Nalka : Length 28.50 km, dia 24 inch. Linepipe specification API 5L 60X LSAW. Thickness ----, Coating Hot applied Coal Tar Enamel and CC. Valve station 2 nos and scraper station 2 nos. Capacity 250 mmcfd(MAOP 1000 psig) c) Nalka-Baghabari : Length 35.50 km, dia 20 inch. Linepipe specification API 5L 60X LSAW. Thickness ----, Coating Hot applied Coal Tar Enamel and CC. Valve station 2 nos and scraper station 2 nos. Capacity 250 mmcfd(MAOP 1000 psig)



Others   Starting date July 1997, completion date June 2000. Approved Total cost Tk 304.00 crore(foreign:93.79, Local:210.21). Actual cost Tk 172.39 crore(foreign:0.24, Local:172.15)
Contact Information  GM Planning
Download File