Rashidpur-Ashuganj gas transmission Project(1s stage)(Habiganj-Ashuganj Part: 30" dia 54 KM)
Project Type
Completed
Objective
The main objectives of the project (30" dia, 82 KM) is to facilitate transmission of increamental production of North-Eastern gas fields i.e. Kailastilla, Beanibazar, Jalalabad, Fenchuganj, Rashidpur, Bibiyana, Habiganj and Titas to national gas grid for meeting the demand of Titas Francise Area(TFA), Bakhrabad Francise Area(BFA)and Wes gas. It will be possible to transmit gas through the proposed loop line at the rate of 375-425 MMCFD at 900-850 psig to Ashuganj Metering Station.
Starting date July 1997, completion date May 2002. Approved Total cost Tk 194.20 crore(foreign:--, Local: 194.20.). Actual cost Tk 177.12 crore(foreign:--, Local: 177.12)