To Evacuate gas and condensate from Bakharabath gas field to national grid.
Salient Feature
Length 58.50 km, dia 30 inch.
Linepipe specification API 5L 60X LSAW. Thickness ----, Coating Hot applied Coal Tar Enamel and CC. Valve station 2
Others
Starting date April 1994, completion date December 1997. Approved Total cost Tk 279.16 crore,(foreign:183.91 Local, 95.25). Actual cost Tk 249.42 crore(foreign:149.00, Local: 100.42)