| Ref. No. |
Tender Notice |
Posted Date |
Tender Document |
| GTCL/Dev/Const/23/08/2009-2010 |
|
Construction of surface drain at proposed Elenga Compressor Station, Tangail. |
2010-02-11 |
|
| |
| GTCL/B-RP/EPC/002. |
|
Design, Build and Turnkey Supply, Installation, Construction, Testing, Commissioning of 1 (one) City Gate Station (CGS) at Rajshahi and 2 (two) District Regulating Stations (DRS) at Puthia & Natore. |
2010-01-28 |
|
| |
| GTCL/Dev/Const/25/ |
|
Maintenance of boundary wall, security post & barbed wire fencing and sanitary works at AGMS and construction of fencing work at valve station-R & S in Shahbazpur, B-Baria. |
2010-01-25 |
|
| |
| GTCL/Dev/ Const/26/05/2009-2010 |
|
Construction of Security Post, Observation Tower and installation of Water Supply System at CGS, Demra |
2010-01-25 |
|
| |
| GTCL/Dev/Const/25/04/2009-2010 |
|
Maintenance of civil, sanitary & electrical works and construction of internal road at TBS, Bogra. |
2009-11-04 |
|
| |
| GTCL/Dev/const/25/03/2009-2010 |
|
Maintenance of civil, sanitary & electrical works at CGS Baghabari, Sirajganj. |
2009-10-28 |
|
| |
| GTCL/J-B/EPC/Rx-ing, dated: 3 August 2009 |
|
Extention of BID Submission Deadline of Installation of High Pressure Natural Gas Pipeline by Horizontal Directional Drilling (HDD) method of West Bank of Jamuna-Bhemara project |
2009-10-06 |
|
| |
| Ref. No. GTCL(Project)/M-J/EPC/R-Xing |
|
Extention Of Tender Closing Date of Installation of High Pressure Natural Gas Pipeline by Horizontal Directional Drilling (HDD) of Monohordi- Dhanua- Elanga- East Bank of Jamuna Bridge Gas Transmission Pipeline and Installation of Compressor at Ashuganj a |
2009-09-29 |
|
| |
| GTCL/Dev/Const/24/01/2009-2010 |
|
Protection Work along the ROW of BKB-Chittagong Pipeline at Rajapur, Laksham, Comilla. |
2009-09-10 |
|
| |
| Ref. No. GTCL(Project)/M-J/PC |
|
Extention of tendar closiing date of Construction of 51 Km Long 762mm (30 Inch) DN X 1000 Psig High Pressure Natural Gas Transmission Pipeline under Monohordi-Dhanua-Elenga-East Bank of Jamuna Bridge Gas Transmission Pipeline and Installation of Compresso |
2009-09-02 |
|
| |
| IFB No.: GTCL (Project)/M-J/EPC/R-Xing IFB No.: GTCL (Project |
|
Installation of High Pressure Natural Gas Pipeline by Horizontal Directional Drilling (HDD) of Monohordi- Dhanua- Elanga- East Bank of Jamuna Bridge Gas Transmission Pipeline and Installation of Compressor at Ashuganj and Elanga Project |
2009-08-10 |
 |
| |
| IFB No.: GTCL/J-B/EPC/Rx-ing |
|
Installation of High Pressure Natural Gas Pipeline by Horizontal Directional Drilling (HDD) method of West Bank of Jamuna-Bhemara project(Group-A). |
2009-08-09 |
 |
| |
| IFB No.: GTCL/J-B/EPC/Rx-ing |
|
Installation of High Pressure Natural Gas Pipeline by Horizontal Directional Drilling (HDD) method of West Bank of Jamuna-Bhemara project (Group-B) |
2009-08-09 |
 |
| |
| IFB NO: GTCL/J-B/PLC/001 |
|
Construction of 762mm (30 inch) DN x 1000 psig high pressure natural gas transmission pipeline from Hatikumrul to Bheramara |
2009-07-08 |
|
| |
| IFB NO: GTCL(Project)/M-J/PC |
|
Construction of 762mm (30 inch) DN x 1000 psig high pressure natural gas transmission pipeline from Monohordi to Dhanua and Elenga to East Bank of Jamuna Bridge |
2009-07-08 |
|
| |
| GTCL/Dev/Const/32/17/2008-2009 |
|
Construction of cubicles and other ancillary works for GTCL’s Head Office at level-3,4,5 & 6 of Red Crescent Borak Tower, Eskaton, Dhaka. |
2009-05-28 |
|
| |
| GTCL/B-RP/MP/007 |
|
Procurement of Cathodic Protection (CP) Materials for High Pressure Natural Gas Transmission Pipeline. |
2009-05-25 |
|
| |
| GTCL/B-RP/MP/007 |
|
Procurement of Cathodic Protection (CP) Materials for High Pressure Natural Gas Transmission Pipeline. |
2009-05-13 |
|
| |
| GTCL/B-RP/PLC/001 |
|
Amendment Notice (3rd) of Construction of 52 Km Long 323.90mm (12.75") OD X 1000 Psig High Pressure Cross Country Natural Gas Transmission Pipeline From Bonpara To Rajshahi. |
2009-05-13 |
|
| |
| Ref. No: GTCL/B-RP/PLC/001 |
|
Amendment Notice (2nd) for Construction of 52 Km Long 323.90mm (12.75") OD X 1000 Psig High Pressure Cross Country Natural Gas Transmission Pipeline From Bonpara To Rajshahi. |
2009-04-29 |
|
| |
| Ref. No. GTCL/Dev/Const/J-B/28/02/2008-2009 |
|
Issue of Notification of Award to M/S Troyee Enterprise. |
2009-04-21 |
|
| |
| Ref. No. GTCL/Dev/Const/B-R/29/02/2008-2009 |
|
Issue of Notification of Award to M/S Jamuna Construction. |
2009-04-21 |
|
| |
| Ref. No. GTCL/Dev/Const/J-B/28/01/2008-2009 |
|
Issue of Notification of Award toM/S Sigma Construction Company. |
2009-04-21 |
|
| |
| Ref. No. GTCL/Dev/Const/B-R/29/01/2008-2009 |
|
Issue of Notification of Award to Md. Saidur Rahman & Co. (Pvt.) Ltd. |
2009-04-21 |
|
| |
| Ref. No: GTCL/B-RP/PLC/001 |
|
Amendment Notice |
2009-04-12 |
 |
| |
| GTCL/B-RP/PLC/001 |
|
Construction of 52 Km Long 323.90mm (12.75") OD X 1000 Psig High Pressure Cross Country Natural Gas Transmission Pipeline From Bonpara To Rajshahi. |
2009-03-09 |
|
| |
| GTCL/Dev/Const/23/15/2008-2009 |
|
Construction of Boundary Wall, Guide Wall, RCC Palisading, Land Development Works, Approach Road & Internal Road and maintenance works of existing Boundary Wall at Elenga, Tangail under Compressor Station Project. |
2009-02-09 |
|
| |
| GTCL/ESD/CCS/2009-02 date: 28.01.2009. |
|
Operation, Maintenance and Development Works of the CP system of GTCL Operated Pipelines. |
2009-02-02 |
|
| |
| GTCL/Dev/ Const/26/ 14/2008-2009 |
|
Construction of Surface Drain, Slope Protection & Guide Wall and maintenance works of existing Boundary Wall & Surface Drain at Ashuganj Gas Manifold Station, B-Baria. |
2009-01-12 |
|
| |
| GTCL/Dev/ Const/J-B/28/ 02/2008-2009 |
|
Construction of Retaining & Boundary Wall, Approach Road, Security Post and Land Development Works at proposed Bheramara City Gate Station and construction of Guide Wall & placing of RCC Post at proposed Ishwardi Metering Station. |
2009-01-04 |
|
| |
| GTCL/Dev/ Const/J-B/28/ 01/2008-2009 |
|
Construction of Retaining & Boundary Wall, Approach Road, Internal Road, Guide Wall and Land Development Works at Hatikumrul Scraper Trap Station, Sirajganj. |
2009-01-04 |
|
| |
| GTCL/Dev/ Const/B-R/29 /02/2008-2009 |
|
Construction of Boundary Wall, Approach Road, Security Post and Land Development Works at proposed Bonpara Gas Manifold Station, Natore. |
2008-12-30 |
|
| |
| GTCL/Dev/ Const/B-R/29 /01/2008-2009 |
|
Construction of Boundary Wall, Approach Road, Security Post, Chainlink Fencing Work, Stair Case and Land Development Works at proposed CGS, Rajshahi. |
2008-12-30 |
|
| |
| GTCL/Dev/Const/25/08/2008-2009 |
|
Maintenance works of existing buliding, boundary wall, approach road and surafce drain at Kutambapur TBS, Dewanbagh TBS, Sonargaon TBS and Demra CGS. |
2008-11-16 |
|
| |
| GTCL/Dev/Const/26/06/2008-2009 |
|
Construction of 1-storied (2-storied foundation) Office Building cum Ansar Barrack at Laksham TBS, Comilla. |
2008-10-19 |
|
| |
| GTCL/Dev/Const/25/07/2008-2009 |
|
Maintenance Works of Control Buliding at Khatihata, Ansar Barrack at AGMS and construction of Shed for Fire Extinguisher at different locations of Valve Stations, Chain-link Fencing & installation of Water Pump with distribution line and construction of O |
2008-10-19 |
|
| |
| GTCL/Dev/Const/26/05/2008-2009 |
|
Construction of Internal Road, Barbed Wire Fencing with RCC Pillar, Land Development, supplying & installation of Tubewell and maintenance works at Mirsharai Telecom Base, Chittagong. |
2008-10-16 |
|
| |
| GTCL/Dev/Const/24/04/2008-2009 |
|
Construction & maintenance works along the ROW of Elenga-Baghabari Pipeline at West Bank of Jamuna Bridge & Nalka-Bogra Pipeline, Nalka Valve Station and Baghabari CGS, Sirajganj. |
2008-10-13 |
|
| |
| GTCL/Dev/Const/24/01/2008-2009 |
|
Construction of Pre-Engineered Steel Ware House at Ashuganj, B-Baria. (Re-Tender) |
2008-10-13 |
|
| |
| GTCL/Dev/Const/24/02/2008-2009 |
|
Maintenance and construction works along the ROW of N-S & R-A Pipeline at Raghunandanpur Valve Station, Haritola Chara & Shahpur Chara in Habiganj. (Re-Tender). |
2008-10-08 |
|
| |
| GTCL/Dev/Const/24/02/2008-2009 |
|
Maintenance and construction works along the ROW of N-S & R-A Pipeline at Raghunandanpur Valve Station, Haritola Chara & Shahpur Chara in Habiganj. (Re-Tender). |
2008-10-08 |
|
| |
| GTCL/Dev/Const/24/03/2008-2009 |
|
Construction & maintenance works along the ROW of Elenga-Baghabari Pipeline at East Bank of Jamuna Bridge, Elenga Metering Station and Salgrampur Valve Station, Tangail. |
2008-10-08 |
|
| |
| GTCL/B-RP/MP/002(R) |
|
Procurement of Pipeline Induction Bends-Bonpara-Rajshahi Gas Transmission Pipeline Project. |
2008-09-15 |
|
| |
| GTCL/B-SP(Soil)/001 |
|
Soil & Sub-soil Investigation and Measurement of Soil Resistivity along the Bakhrabad-Siddhirganj Gas Transmission Pipeline route. |
2008-08-13 |
|
| |
| GTCL (Project)/M-J/MP/002(R) |
|
Procuremrnt of Pipeline Induction Bends for Monohordi-Dhanua-Elenga-East Bank of Jamuna Bridge |
2008-07-22 |
|
| |
| GTCL/B-RP/MP/006(R) |
|
Procurement of Pipeline Fittings to construct 323.90mm OD 53.00 km length High Pressure (1000 Psig) Natural Gas Transmission Pipeline from Bonpara to Rajshahi |
2008-07-07 |
|
| |
| GTCL/J-B/MP/004(R) |
|
Pipeline Miscellaneous Fittings |
2008-06-23 |
|
| |
| GTCL/OP/Ashu/2007-2008 |
|
The Engineering Modification works at KTL-II for interconnecting BB-KTL pipeline to JGTDSL pipeline inside KTL-II Scraper Trap Station, Golapganj, Sylhet. |
2008-06-22 |
|
| |
| GTCL(Project)/M-J/MP/001(R) |
|
Anti-Corrosion Coated Line Pipes, Station Pipes and Casing Pipes |
2008-06-15 |
|
| |
| GTCL/J-B/ MP/001(R) |
|
Corrosion Coated Line Pipes, Station Pipes and Casing Pipes |
2008-05-25 |
|
| |
|
|
Addendum No.-1 Extension of Deadline for Submission of Bids |
2008-04-10 |
|
| |
| GTCL/Dev/Const/24/36/2007-2008 |
|
|
2008-04-03 |
|
| |
| GTCL/B-RP/MP/002(R) |
|
Corrigendum Notice-Pipeline Induction Bends-Bonpara-Rajshahi Gas Transmission Pipeline Project |
2008-04-03 |
|
| |
| GTCL/B-RP/MP/002(R), 004(R) |
|
Pipeline Induction Bends, Pipeline Ball Valves |
2008-03-04 |
|
| |
| GTCL/B-RP/MP/002(R), 004(R) |
|
Pipeline Induction Bends, Pipeline Ball Valves |
2008-03-04 |
|
| |
| GTCL/ Dev/Const/24/35/2007-2008, Date: 02.03.2008 |
|
Land development works for the washed out area along the ROW of Elenga-Nalka Gas Pipeline (West bank to Nalka Section) near W-7, W-8, W-10 & W-11 Box Culvert of JMBA. |
2008-02-28 |
|
| |
| GTCL/Dev/Const/26/23/2007-2008 |
|
Construction of Pre-Engineered Steel Ware House at Ashuganj. |
2008-01-27 |
|
| |
| GTCL/Dev/Const/26/23/2007-2008 |
|
Construction of Pre-Engineered Steel Ware House at Ashuganj. |
2008-01-27 |
|
| |
| GTCL/Dev/Const/28/15/2007-2008 |
|
Construction of Pre-Engineered Steel Ware House at Hatikumrul, Sirajganj. |
2008-01-27 |
|
| |
| GTCL/CSP/ESP/001(Re) |
|
Invitation for Bids (Re-Bidding) of Natural Gas Compressor Station and ancillary facilities at Rashidpur (Muchai), Ashuganj (South & West) and Elenga. |
2008-01-23 |
|
| |
| GTCL/B-KP/MP(CM)/002 and IFB No. GTCL/B-KP/MP(IB)/003 |
|
Extension of Bid Closing & Opening Time of Bheramara-Khulna Project. |
2008-01-22 |
|
| |
| GTCL/Dev/Const/24/33/2007-2008 |
|
Repair & maintenance work of the damaged portion along the ROW of BKB-Demra High Pressure Gas Pipeline at a khal near Gomoti Bridge. |
2008-01-14 |
|
| |
| GTCL (Project)/M-J/MP/005(R) |
|
Revised Invitation for Bid of Pipeline Ball Valves |
2007-12-10 |
|
| |
| GTCL (Project)/M-J/MP/002 (R) >CL (Project)/M-J/MP/004 (R) |
|
Revised Invitation for Bids of Pipeline Induction Bends and Miscellaneous Fittings |
2007-12-10 |
|
| |
| GTCL/Development/Construction/24,25/1904 |
|
Maintenance work along the ROW of N-S & R-A Gas Pipeline near Habiganj Gas Field. |
2007-12-06 |
|
| |
| Ref. No: GTCL/B-KP/MP/002-3/90 |
|
Procurement of Coating Materials (Heat Shrink Sleeves, Tape & Primer) and Pipeline Induction Bends |
2007-11-18 |
|
| |
| EOI Ref No: GTCL / P.Planning/RFP.01/ |
|
Request for Expression of Interest for Consultency Services on detailed route Survey, IEE, EIA and RAP of proposed Gas Transmission Pipeline from Titas Gas Field to A-B Pipeline. |
2007-11-15 |
|
| |