| Ref. No. |
Tender Notice |
Posted Date |
Tender Document |
| GTCL/Dev/Const/32/17/2008-2009 |
|
Construction of cubicles and other ancillary works for GTCL’s Head Office at level-3,4,5 & 6 of Red Crescent Borak Tower, Eskaton, Dhaka. |
2009-05-28 |
|
| |
| GTCL/B-RP/MP/007 |
|
Procurement of Cathodic Protection (CP) Materials for High Pressure Natural Gas Transmission Pipeline. |
2009-05-25 |
|
| |
| GTCL/B-RP/MP/007 |
|
Procurement of Cathodic Protection (CP) Materials for High Pressure Natural Gas Transmission Pipeline. |
2009-05-13 |
|
| |
| GTCL/B-RP/PLC/001 |
|
Amendment Notice (3rd) of Construction of 52 Km Long 323.90mm (12.75") OD X 1000 Psig High Pressure Cross Country Natural Gas Transmission Pipeline From Bonpara To Rajshahi. |
2009-05-13 |
|
| |
| Ref. No: GTCL/B-RP/PLC/001 |
|
Amendment Notice (2nd) for Construction of 52 Km Long 323.90mm (12.75") OD X 1000 Psig High Pressure Cross Country Natural Gas Transmission Pipeline From Bonpara To Rajshahi. |
2009-04-29 |
|
| |
| Ref. No. GTCL/Dev/Const/J-B/28/02/2008-2009 |
|
Issue of Notification of Award to M/S Troyee Enterprise. |
2009-04-21 |
|
| |
| Ref. No. GTCL/Dev/Const/B-R/29/02/2008-2009 |
|
Issue of Notification of Award to M/S Jamuna Construction. |
2009-04-21 |
|
| |
| Ref. No. GTCL/Dev/Const/J-B/28/01/2008-2009 |
|
Issue of Notification of Award toM/S Sigma Construction Company. |
2009-04-21 |
|
| |
| Ref. No. GTCL/Dev/Const/B-R/29/01/2008-2009 |
|
Issue of Notification of Award to Md. Saidur Rahman & Co. (Pvt.) Ltd. |
2009-04-21 |
|
| |
| Ref. No: GTCL/B-RP/PLC/001 |
|
Amendment Notice |
2009-04-12 |
|
| |
| GTCL/B-RP/PLC/001 |
|
Construction of 52 Km Long 323.90mm (12.75") OD X 1000 Psig High Pressure Cross Country Natural Gas Transmission Pipeline From Bonpara To Rajshahi. |
2009-03-09 |
|
| |
| GTCL/Dev/Const/23/15/2008-2009 |
|
Construction of Boundary Wall, Guide Wall, RCC Palisading, Land Development Works, Approach Road & Internal Road and maintenance works of existing Boundary Wall at Elenga, Tangail under Compressor Station Project. |
2009-02-09 |
|
| |
| GTCL/ESD/CCS/2009-02 date: 28.01.2009. |
|
Operation, Maintenance and Development Works of the CP system of GTCL Operated Pipelines. |
2009-02-02 |
|
| |
| GTCL/Dev/ Const/26/ 14/2008-2009 |
|
Construction of Surface Drain, Slope Protection & Guide Wall and maintenance works of existing Boundary Wall & Surface Drain at Ashuganj Gas Manifold Station, B-Baria. |
2009-01-12 |
|
| |
| GTCL/Dev/ Const/J-B/28/ 02/2008-2009 |
|
Construction of Retaining & Boundary Wall, Approach Road, Security Post and Land Development Works at proposed Bheramara City Gate Station and construction of Guide Wall & placing of RCC Post at proposed Ishwardi Metering Station. |
2009-01-04 |
|
| |
| GTCL/Dev/ Const/J-B/28/ 01/2008-2009 |
|
Construction of Retaining & Boundary Wall, Approach Road, Internal Road, Guide Wall and Land Development Works at Hatikumrul Scraper Trap Station, Sirajganj. |
2009-01-04 |
|
| |
| GTCL/Dev/ Const/B-R/29 /02/2008-2009 |
|
Construction of Boundary Wall, Approach Road, Security Post and Land Development Works at proposed Bonpara Gas Manifold Station, Natore. |
2008-12-30 |
|
| |
| GTCL/Dev/ Const/B-R/29 /01/2008-2009 |
|
Construction of Boundary Wall, Approach Road, Security Post, Chainlink Fencing Work, Stair Case and Land Development Works at proposed CGS, Rajshahi. |
2008-12-30 |
|
| |
| GTCL/Dev/Const/25/08/2008-2009 |
|
Maintenance works of existing buliding, boundary wall, approach road and surafce drain at Kutambapur TBS, Dewanbagh TBS, Sonargaon TBS and Demra CGS. |
2008-11-16 |
|
| |
| GTCL/Dev/Const/26/06/2008-2009 |
|
Construction of 1-storied (2-storied foundation) Office Building cum Ansar Barrack at Laksham TBS, Comilla. |
2008-10-19 |
|
| |