| GTCL/Dev/Const/25/07/2008-2009 |
|
Maintenance Works of Control Buliding at Khatihata, Ansar Barrack at AGMS and construction of Shed for Fire Extinguisher at different locations of Valve Stations, Chain-link Fencing & installation of Water Pump with distribution line and construction of O |
2008-10-19 |
|
| |
| GTCL/Dev/Const/26/05/2008-2009 |
|
Construction of Internal Road, Barbed Wire Fencing with RCC Pillar, Land Development, supplying & installation of Tubewell and maintenance works at Mirsharai Telecom Base, Chittagong. |
2008-10-16 |
|
| |
| GTCL/Dev/Const/24/04/2008-2009 |
|
Construction & maintenance works along the ROW of Elenga-Baghabari Pipeline at West Bank of Jamuna Bridge & Nalka-Bogra Pipeline, Nalka Valve Station and Baghabari CGS, Sirajganj. |
2008-10-13 |
|
| |
| GTCL/Dev/Const/24/01/2008-2009 |
|
Construction of Pre-Engineered Steel Ware House at Ashuganj, B-Baria. (Re-Tender) |
2008-10-13 |
|
| |
| GTCL/Dev/Const/24/02/2008-2009 |
|
Maintenance and construction works along the ROW of N-S & R-A Pipeline at Raghunandanpur Valve Station, Haritola Chara & Shahpur Chara in Habiganj. (Re-Tender). |
2008-10-08 |
|
| |
| GTCL/Dev/Const/24/02/2008-2009 |
|
Maintenance and construction works along the ROW of N-S & R-A Pipeline at Raghunandanpur Valve Station, Haritola Chara & Shahpur Chara in Habiganj. (Re-Tender). |
2008-10-08 |
|
| |
| GTCL/Dev/Const/24/03/2008-2009 |
|
Construction & maintenance works along the ROW of Elenga-Baghabari Pipeline at East Bank of Jamuna Bridge, Elenga Metering Station and Salgrampur Valve Station, Tangail. |
2008-10-08 |
|
| |
| GTCL/B-RP/MP/002(R) |
|
Procurement of Pipeline Induction Bends-Bonpara-Rajshahi Gas Transmission Pipeline Project. |
2008-09-15 |
|
| |
| GTCL/B-SP(Soil)/001 |
|
Soil & Sub-soil Investigation and Measurement of Soil Resistivity along the Bakhrabad-Siddhirganj Gas Transmission Pipeline route. |
2008-08-13 |
|
| |
| GTCL (Project)/M-J/MP/002(R) |
|
Procuremrnt of Pipeline Induction Bends for Monohordi-Dhanua-Elenga-East Bank of Jamuna Bridge |
2008-07-22 |
|
| |
| GTCL/B-RP/MP/006(R) |
|
Procurement of Pipeline Fittings to construct 323.90mm OD 53.00 km length High Pressure (1000 Psig) Natural Gas Transmission Pipeline from Bonpara to Rajshahi |
2008-07-07 |
|
| |
| GTCL/J-B/MP/004(R) |
|
Pipeline Miscellaneous Fittings |
2008-06-23 |
|
| |
| GTCL/OP/Ashu/2007-2008 |
|
The Engineering Modification works at KTL-II for interconnecting BB-KTL pipeline to JGTDSL pipeline inside KTL-II Scraper Trap Station, Golapganj, Sylhet. |
2008-06-22 |
|
| |
| GTCL(Project)/M-J/MP/001(R) |
|
Anti-Corrosion Coated Line Pipes, Station Pipes and Casing Pipes |
2008-06-15 |
|
| |
| GTCL/J-B/ MP/001(R) |
|
Corrosion Coated Line Pipes, Station Pipes and Casing Pipes |
2008-05-25 |
|
| |
|
|
Addendum No.-1 Extension of Deadline for Submission of Bids |
2008-04-10 |
|
| |
| GTCL/Dev/Const/24/36/2007-2008 |
|
|
2008-04-03 |
|
| |
| GTCL/B-RP/MP/002(R) |
|
Corrigendum Notice-Pipeline Induction Bends-Bonpara-Rajshahi Gas Transmission Pipeline Project |
2008-04-03 |
|
| |
| GTCL/B-RP/MP/002(R), 004(R) |
|
Pipeline Induction Bends, Pipeline Ball Valves |
2008-03-04 |
|
| |
| GTCL/B-RP/MP/002(R), 004(R) |
|
Pipeline Induction Bends, Pipeline Ball Valves |