| GTCL/ Dev/Const/24/35/2007-2008, Date: 02.03.2008 |
|
Land development works for the washed out area along the ROW of Elenga-Nalka Gas Pipeline (West bank to Nalka Section) near W-7, W-8, W-10 & W-11 Box Culvert of JMBA. |
2008-02-28 |
|
| |
| GTCL/Dev/Const/26/23/2007-2008 |
|
Construction of Pre-Engineered Steel Ware House at Ashuganj. |
2008-01-27 |
|
| |
| GTCL/Dev/Const/26/23/2007-2008 |
|
Construction of Pre-Engineered Steel Ware House at Ashuganj. |
2008-01-27 |
|
| |
| GTCL/Dev/Const/28/15/2007-2008 |
|
Construction of Pre-Engineered Steel Ware House at Hatikumrul, Sirajganj. |
2008-01-27 |
|
| |
| GTCL/CSP/ESP/001(Re) |
|
Invitation for Bids (Re-Bidding) of Natural Gas Compressor Station and ancillary facilities at Rashidpur (Muchai), Ashuganj (South & West) and Elenga. |
2008-01-23 |
|
| |
| GTCL/B-KP/MP(CM)/002 and IFB No. GTCL/B-KP/MP(IB)/003 |
|
Extension of Bid Closing & Opening Time of Bheramara-Khulna Project. |
2008-01-22 |
|
| |
| GTCL/Dev/Const/24/33/2007-2008 |
|
Repair & maintenance work of the damaged portion along the ROW of BKB-Demra High Pressure Gas Pipeline at a khal near Gomoti Bridge. |
2008-01-14 |
|
| |
| GTCL (Project)/M-J/MP/005(R) |
|
Revised Invitation for Bid of Pipeline Ball Valves |
2007-12-10 |
|
| |
| GTCL (Project)/M-J/MP/002 (R) >CL (Project)/M-J/MP/004 (R) |
|
Revised Invitation for Bids of Pipeline Induction Bends and Miscellaneous Fittings |
2007-12-10 |
|
| |
| GTCL/Development/Construction/24,25/1904 |
|
Maintenance work along the ROW of N-S & R-A Gas Pipeline near Habiganj Gas Field. |
2007-12-06 |
|
| |
| Ref. No: GTCL/B-KP/MP/002-3/90 |
|
Procurement of Coating Materials (Heat Shrink Sleeves, Tape & Primer) and Pipeline Induction Bends |
2007-11-18 |
|
| |
| EOI Ref No: GTCL / P.Planning/RFP.01/ |
|
Request for Expression of Interest for Consultency Services on detailed route Survey, IEE, EIA and RAP of proposed Gas Transmission Pipeline from Titas Gas Field to A-B Pipeline. |
2007-11-15 |
|
| |